Uprating & Retrofitting of Hydropower Station
Uprating and Retrofitting of Hydropower Station
Visits: Author:Dongfang YOYIK Engineering Co; Ltd,

Hydraulic turbine and Generator for the old power station, design and manufacture the new type of efficient runner (Axial flow, eddy flow, impact), reforming for the labyrinth seal and tail pipe.


◆Design and manufacture related flow components for power station.
◆Reform the main seal for Hydraulic turbine
◆Reform the globe valve and servomotor seal of Hydraulic turbine.
◆Replacing Babbitt thrust bearing into fluoroplastic bearing.
◆Remove and replace the exciter with auxiliary generators
◆Design and manufacture a new type of oil cooler, improve the cooling system.
◆Design and manufacture of non-standard parts for Hydropower Station

Copyright Reserved 2016 @ Dongfang YOYIK Engineering Co; Ltd, PHONE:+86 838-2226655 2306509 2207616 2310388
ADDRESS:15F, Block B, Kaixuan Int'l Building, Deyang, Sichuan

Online Service

SERVICE
点击这里给我发消息
SERVICE
点击这里给我发消息
SERVICE
点击这里给我发消息